New tungsten supply outside China is arriving, but in small amounts. The Dolphin mine in Tasmania produced 13,712 metric tonne units (MTU) of tungsten trioxide in the quarter to September 30, 2026, its record throughput. That is about 137 tonnes of WO₃ in three months.

The arithmetic

Item Figure
Dolphin ore processed, quarter to Sep 30 81,098 t, a record (up from 77,953 t)
Average feed grade 0.29% WO₃
Concentrate produced 13,712 MTU (about 137 t WO₃)
Annualised, if the quarter repeats About 550 t WO₃
Draft estimate of the 2026 ex-China supply gap About 21,000 t WO₃
Dolphin annualised as a share of that gap About 2.6%

Prices compiled from publicly available market information and our own transaction data. No third-party source, platform, or company is represented as the basis for any rate shown. Moves are percentage changes. Company figures are as reported by the companies and summarised here. Information only — not a buy/sell recommendation and not a price forecast. Trading involves risk of loss. Consult a qualified professional before trading and verify independently.

One MTU is 10 kg of WO₃. The annualised figure is our arithmetic from one quarter and is not company guidance. The gap figure is from a draft industry analysis, so treat it as indicative.

The wider pipeline

What it means

One working mine at record output covers a few percent of the gap. Meaningful volume comes from a pipeline arriving from 2027 to 2029, and scrap fills part of the difference before then. That is why scrap and documented origin carry a premium and why Rotterdam and China behave differently. See the China–Europe gap.

WolfTrack is free. Get every Thursday issue on the WolfTrack WhatsApp channel, or chat with us on WhatsApp. Latest: WolfTrack Issue #5.